CI-DigiWaste Français

We don't throw it out. We fire it up.

Cassava peelings, spent grain, processing residues: in Côte d'Ivoire, much of this waste is left to rot in the open.

We feed it into an integrated biomethanation unit. Out come biogas for cooking and a controlled digestate for the soil.

Look inside the unit

Illustration

The unit, part by part

Turn the unit around and open each part: what it does, where it sits, why it is there.

Illustration

3D view: arrow keys to rotate, + and − to zoom, 0 to reset, Esc to close a card.

Guided tour

Nine parts, one journey: from peelings to the flame under the cooking pot. Follow the tour or tap a part.

Or pick a part on the unit.

1 Preparation and hopper

Explain it simply

What it does
We grind the cassava peelings and mix them with pressing water, like a thin porridge.
Where it sits
Under the shed, next to where the cassava is peeled.
Why it is there
The finer the pieces, the faster the tiny living things in the digester can eat them.
Why it is needed
Without it, big chunks and sand would clog the unit.

Technical details

What it does
Grinding, dilution with pressing water and screening of the feedstock before loading.
Where it sits
At the head of the line, on the slab, as close as possible to the site's waste.
Why it is there
Fine particle size and diluted matter make digestion faster and steadier.
Why it is needed
The screen holds back sand and long fibres, which would foul the digester.

Dimensions

Inlet hopper volume
coming soon

2 Potash buffering

Key step

No buffering, no gas. Local potash keeps the mix at a stable pH (pH 6.8 to 7.4): this is what the sensors watch around the clock.

Explain it simply

What it does
We add a little local potash to take the acidity out of the mix.
Where it sits
Between preparation and the digester.
Why it is there
Cassava peelings make the mix sour, like a lemon.
Why it is needed
Without it, the tiny living things stop dead and the unit makes no more gas.

Technical details

What it does
Dosing of local potash, made from leached wood ash, to hold the digester's pH.
Where it sits
On the feed line, upstream of the digester, with a pH probe.
Why it is there
Cassava residues acidify the medium; a falling pH stops the methane-producing bacteria.
Why it is needed
This is the step production depends on: the pH probe is monitored remotely at all times.

Dimensions

Buffering reagent
local potash (leached ash) target
Target pH in the digester
pH 6.8 to 7.4 target
Target alkalinity
2,000 to 4,000 mg CaCO₃/L target
Target VFA/alkalinity ratio
< 0.4 target
Buffering monitoring
pH probe + remote alert target

3 Digester

Explain it simply

What it does
This is the stomach. Tiny living things eat the waste here, without air.
Where it sits
In the middle of the unit. It is the biggest part.
Why it is there
Like a closed pot simmering for a long time, it gives the waste time to change.
Why it is needed
This is where the gas is born. Without it, no biogas.

Technical details

What it does
Sealed, banded high-density polyethylene tank on a masonry base, where anaerobic digestion takes place.
Where it sits
In the middle of the slab, between buffering and digestate separation.
Why it is there
The retention time of the matter determines how much of the waste becomes biogas.
Why it is needed
Methane-producing microorganisms only live where there is no oxygen.

Dimensions

Phase 1 integrated biomethanation unit
5,000 to 10,000 L (5 to 10 m³) target
Digester diameter
coming soon
Digester height
coming soon
Retention time of waste in the pilot
coming soon

4 Gas-holder dome

Explain it simply

What it does
It is a balloon that fills up with the gas rising from the stomach.
Where it sits
Right on top of the digester, like a domed lid.
Why it is there
The gas is light: it rises on its own and collects at the top.
Why it is needed
It keeps the gas warm and safe until it is cleaned.

Technical details

What it does
Collects raw biogas above the digesting matter and evens out changes in volume.
Where it sits
Closes the top of the digester; the raw gas outlet leaves from its crown.
Why it is there
Biogas production is not constant; the dome absorbs the swings.
Why it is needed
It keeps the tank sealed; a mixer passes through the dome to stir the matter.

Dimensions

Gas-holder dome volume
coming soon

5 Digestate separation

Explain it simply

What it does
What is left after digestion is pressed out: a liquid on one side, fibres on the other.
Where it sits
At the digester outlet, on the field side.
Why it is there
What remains after digestion can still feed the soil.
Why it is needed
It is checked before use: nothing goes to the fields without control.

Technical details

What it does
Screw pressing of the digestate into a liquid fraction and solid fibres.
Where it sits
Downstream of the digester, on the digestate drain.
Why it is there
Separating the fractions makes them easier to store, check and spread.
Why it is needed
Digestate is checked before any return to the land; without that check, it is not spread.

Dimensions

Separation equipment
screw press target
Dry matter of fibres after pressing
22 to 28 % target
Liquid fraction
nitrogen-rich fertiliser target
Separation rate
continuous, on digestate purge target

6 Storage

Explain it simply

What it does
It is a big soft cushion that fills up with gas.
Where it sits
Under the shed, in the shade.
Why it is there
It swells overnight and empties when cooking is under way.
Why it is needed
Thanks to it, there is gas when it is time to cook the attiéké.

Technical details

What it does
Low-pressure flexible gas bag, buffering production against consumption.
Where it sits
Under the metal-roofed shed, on a cradle, downstream of the dome.
Why it is there
Production is continuous; consumption is concentrated in cooking hours.
Why it is needed
It decouples production from use and keeps a steady flow at the burner.

Dimensions

Purified biogas storage volume
coming soon

7 Purification

Explain it simply

What it does
The gas goes through a cartridge filled with iron shavings.
Where it sits
Between the gas cushion and the kitchen.
Why it is there
The shavings trap the rotten-egg smell.
Why it is needed
Clean gas does not sting the eyes and does not damage the burner.

Technical details

What it does
Desulphurisation on regenerable iron filings; removal of condensed water.
Where it sits
Downstream of storage, upstream of the meter.
Why it is there
Raw biogas contains hydrogen sulphide, which is corrosive and foul-smelling.
Why it is needed
Only purified biogas reaches the burner; without purification, equipment corrodes.

Dimensions

Purification flow rate
coming soon
Methane content of the pilot's raw biogas
coming soon

8 Meter and burner

Explain it simply

What it does
The gas arrives under the attiéké pot. A meter measures what the site uses.
Where it sits
At the end of the line, close to the tank: the gas barely travels.
Why it is there
This is where the morning's peelings are put to work cooking.
Why it is needed
The meter says what the site pays: only the gas it uses.

Technical details

What it does
Volumetric metering with remote reading, then a burner set up for purified biogas.
Where it sits
Masonry hearth at the end of the line, on the processing site.
Why it is there
The gas is used on site: no compression, no bottling.
Why it is needed
Billing is by volume used; a burner tuned for biogas gives a steady flame.

Dimensions

Use point power
coming soon
Raw biogas expected from a phase 1 unit
coming soon

9 Remote monitoring

Explain it simply

What it does
It is the unit's health record. It sends news to a phone.
Where it sits
A small shelter with a solar panel, at the edge of the slab.
Why it is there
Like a thermometer, it tells us whether the stomach is doing well.
Why it is needed
We see straight away if something is wrong, without waiting for a breakdown.

Technical details

What it does
Sensors and transmission of operating data to the team.
Where it sits
Cabinet under a canopy, solar-powered, linked to the pH and temperature probes and to the meter.
Why it is there
Drifts in temperature, pressure or output signal a digestion going off track.
Why it is needed
It lets us step in early and document the results of every unit.

Dimensions

Parameters monitored remotely
coming soon
Interval between two readings
coming soon

From waste to flame

  1. Organic waste

    The site's residues are sorted. Only organic matter goes into the unit.

  2. Biomethanation

    Without air, microorganisms break the matter down. It stays in the unit for as long as that takes.

  3. Biogas

    What comes out is raw biogas. It is purified before any use.

  4. Uses

    Purified biogas is used for cooking. The digestate, once checked, can go back to the land.

The solution in detail

In order of priority

What the unit changes

01 Environment

Waste no longer rots in the open. Its methane is captured instead of escaping.

02 Social

A gas flame gives off less smoke than a wood fire.

Running the unit takes staff on site.

03 Economy

The site can cut what it pays to dispose of its waste.
It can also buy less fuel.

Where the project stands

Done

A 600 L (0.6 m³) pilot has run. Its results were audited by a specialist firm in the sector.

Read the results

Phase 1 · under way

We are selecting agri-food processing sites for the first 5,000 to 10,000 L (5 to 10 m³) unit. This stage takes 7 days at most.

See the five phases

5,000 to 10,000 L

i.e. 5 to 10 m³

Phase 1 integrated biomethanation unit

Nature : target

Scope
One unit, agri-food processing site
Method
Sizing chosen for phase 1

7 days

Maximum duration of phase 1

Nature : target

Scope
Site validation, before launch
Method
Project schedule

Next

Then, selling biogas to gas-using small businesses, and equipping rural communities.

Do you process farm produce?

Your organic waste can become your cooking gas. Let's talk about your site.

Write to us