What the figures say

Every value comes from the project's data register. Each one states its nature, scope and method. A value that is not established is not published.

The completed pilot

The pilot is complete. Its results were audited by a specialist firm in the sector; laboratory tests analysed the gas and the digestate.

600 L

i.e. 0.6 m³

Volume of the completed pilot

Nature : measurement

Scope
Completed pilot
Method
Capacity of the pilot's integrated biodigester

The phase 1 unit

What is targeted for the first unit installed at a customer's site.

5,000 to 10,000 L

i.e. 5 to 10 m³

Phase 1 integrated biomethanation unit

Nature : target

Scope
One unit, agri-food processing site
Method
Sizing chosen for phase 1

7 days

Maximum duration of phase 1

Nature : target

Scope
Site validation, before launch
Method
Project schedule